Microsoft Project Server and SharePoint 2007 and 2010 August CU 2011

August 2011 CU for Microsoft Project and Project Server 2010

Server Rollup Package(Recommended):
Description of the SharePoint Server 2010 and Project Server 2010 Cumulative Update Server Hotfix Package (MOSS server-package, Project server-package): August 30, 2011
http://support.microsoft.com/kb/2553049
Individual Project Server Package:
Only required if you do not install the Server Rollup.
Description of the Project Server 2010 hotfix package (pjsrvwfe-x-none.msp): August 30, 2011
http://support.microsoft.com/kb/2553047
Project Client Package:
Description of the Project 2010 hotfix package (project-x-none.msp): August 30, 2011
http://support.microsoft.com/kb/2584056
More information on deploying the Cumulative Update:
The article below provides information on how to deploy the Project Server Cumulative Update.
Updates for Project Server 2010
http://technet.microsoft.com/en-us/projectserver/gg176680.aspx
As Project Server 2010 is now based on SharePoint Server 2010 we strongly recommend that you install the Project Server 2010 Server Rollup Package as there are a large number of individual server packages for SharePoint Server. The Project Server 2010 Server Rollup Package contains all the patches released in this Cumulative Update for SharePoint Foundation Server 2010, SharePoint Server 2010 and Project Server 2010.
For those accustomed to Project Server 2007 Cumulative Updates, you should note that the MOSS Server Rollup Package does not contain the Project Server patches. You will need to make sure that you install the MOSS + Project Server Rollup Package (the link is provided below). As in Project Server 2007, the Server Rollup Packages are much larger but they will greatly simplify your Project Server patch deployment.
Client Installation:
Installation of the client patch is straightforward and is the same as it was in Project 2007. The instructions for installing the client patch are below.
NOTE: Microsoft strongly recommends testing within a NON-Production environment prior to rollout.
  1. Download the hotfix from the link in the KB Article.
  2. Extract the patch package by running the .exe file that you downloaded.
  3. Run the extracted .exe file to apply the patch to your Project Professional/Standard client.

August 2011 CU for Microsoft Office Project and Project Server 2007

Server Rollup Packages:
Description of the Windows SharePoint Services 3.0 cumulative update package (WSS server-package): August 30, 2011
http://support.microsoft.com/kb/2553022
Description of the Office SharePoint Server 2007 cumulative update package (MOSS server-package): August 30, 2011
http://support.microsoft.com/kb/2553020
Individual Product Packages:
Description of the Office SharePoint Server 2007 hotfix package (sts-x-none.msp): August 30, 2011
http://support.microsoft.com/kb/2553019
Description of the Office Project Server 2007 hotfix package (pjsrvapp-x-none.msp, pjsrvwfe-x-none.msp): August 30, 2011
http://support.microsoft.com/kb/2553024
Description of the Office Project 2007 hotfix package (project-x-none.msp):August 30, 2011
http://support.microsoft.com/kb/2553105
More information on deploying the Cumulative Update:
The article below provides information on how to deploy the Project Server Cumulative Update.
Deploy cumulative updates (Project Server 2007)
http://technet.microsoft.com/en-us/library/dd239177.aspx
Service Pack 2 for both WSS and Office Servers 2007 are required for this Cumulative Update. The KB articles below provide information on how to download and install SP2 if you have not already done so.
Description of Windows SharePoint Services 3.0 SP2 and of Windows SharePoint Services 3.0 Language Pack SP2
http://support.microsoft.com/kb/953338
Description of 2007 Microsoft Office servers Service Pack 2 and of 2007 Microsoft Office servers Language Pack Service Pack 2
http://support.microsoft.com/kb/953334
The Server CU is released in two different versions. The first version is in Individual Packages specific to a particular product like WSS and Project Server. These are smaller downloads but they do not include language packs or patches for other products so patches for those products would have to be downloaded and installed separately.
The second version is the Server Rollup Packages. This is a set of two rollup packages which contains all the fixes for WSS, Project Server and MOSS. These packages should be used when MOSS is part of the deployment and/or you have language packs installed. The Server Rollup Packages are much larger but they will greatly simplify MOSS patch deployment.
Client Installation:
In order to install this hotfix, you will need to have Microsoft Project 2007 SP2 installed on the client.
Description of Office Project 2007 Service Pack 2 (SP2) and of Office Project Language Pack 2007 Service Pack 2 (SP2)
http://support.microsoft.com/kb/953326
Once we know that SP2 is installed, you will install the hotfix by performing the following steps:
NOTE: Microsoft strongly recommends testing within a NON-Production environment prior to rollout.
  1. Download the hotfix from either the KB Article or by using the information at the end of this email.
  2. Extract the patch package by running the .exe file that you downloaded.
  3. Run the extracted .exe file to apply the patch to your Project Professional/Standard SP1 client.

Comments

Anil Kumar Pal said…
Intersting and beautiful blog lovely presentation thanks for sharing your views...microsoft office 2007 We24support tech team are available 24/7 for repairs on computers, printers, laptops, desktops. Our tech team taken to new heights with our technician’s knowledge and support.at 1-866-978-0799 microsoft office 2007 updates

Popular posts from this blog

Update Project level Multiline Text Custom Fields

What a beautilful weather & I was kinda enjoying but suddenly One of My coworker pinged me & asked me a question about the Project level custom fields (multiline Text) so while I explained him about the usage of this kind of field, thought to write down somthing which might help Project Server community :)

Text custom fields can be multiline up to 4000 bytes, for use in project detail pages (PDPs) and with workflows for demand management in Project Web App. Multiline text custom fields are not usable in Project Professional. so I added a Project level Multiline text field in my PDP & now I wanted to update this field in a given project from my PSI program.

Here is the code for the Console application :
1. You will need to add project web service (ProjectWebSvc) web ref in the solution: http://servername/pwa/_vti_bin/PSI/Project.asmx?wsdl
2. Its very basic code, which has TEXT_VALUE update for a Multiline field
__________________________________________________________________…

Microsoft Project Server and SharePoint Server 2007 and 2010 June 2012 CU

The latest Cumulative Updates (CU) for Project and Project Server 2010 and 2007 have been released.  Feel free to open a support case if you have any questions around this or need assistance getting these patches deployed.
Feel free to join us in July for a TechNet webcast to go over these patches in greater detail.  The information for this event is below:
TechNet Webcast: Information About Microsoft Project and Project Server Cumulative June Update (Level 200)
https://msevents.microsoft.com/CUI/EventDetail.aspx?culture=en-US&EventID=1032454430&CountryCode=US
Project and Project Server 2010
This include a number of fixes, so Microsoft strongly recommends that you test this in a test environment based on your production environment before putting this fix live in production.
There was an issue found with one of the other Office Server products which needed to be addressed before release.  The issue has been fixed and the Server Rollup Packages are being rebuilt.  We expect the patch…

Project Server 2010 : bug with deliverables

if you create a new deliverable from Project site (site teamplate is customized..) using the grid row option (you can enter the deliverable name, start & finish), No deletion/update of columns in deviverables but other lists are custiomized. Once deliverable is crated a small message shows "Server is processing the changes to this row". (First screenshot) ANother way to create a new deliverable using the "New Item" form. so I created one more using this option. (Second screenshot) Now, I have two deliverables (D1 & D2) . When I open the MS project, I can see only one (D1) which is created via adding record using row option.(see the last screenshot). So Issue seems to be with the New Item form which doesn't sync the data to server. Looks liks a bug to me.